House update

Forever Home

It’s been a while since I’ve written about the house. We’ve had a fair bit going on but not too many decisions being made about the house.

Plans were submitted for DA in November, the way our local Council goes I’d be surprised if we hear back before March 2017.

Normally you wouldn’t have an engineer draw up plans until you’ve receive DA, something our architect has repeatedly told me, but we can’t wait that long and I have the benefit of having an engineer for a husband. So we’ve started designing the house (fingers crossed Council don’t make any changes, but I guess there is a risk).

Our main reason for starting this early is so we can get a jump on the building process. I’d like to get quotes from builders early in the New Year and have someone locked in to start as soon as we receive DA. It also means we can start planning other things in advance, one of the main things is the flooring. As soon as a friend of ours (who will be doing the final engineered drawings) looked at it he recommended a way we can achieve a polished concrete floor. This was the best phone call I’ve had in a while, I felt like Christmas had come early! I’ve been wanting a polished concrete floor for a while but thought it was off the cards as it would be too expensive/difficult. The only problem is now it’s back on the cards i have to change a lot of other things so it doesn’t look too industrial. I think more timber back into the kitchen and some changes to the staircase as well.

Back to the drawing board!

A few staircases I’m loving.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s